1. Hygiene issue
a. Availability < 100 --> create HCR
b. VSWR alarm --> create HCR
c. RSSI --> create HCR
2. DLUT 10 MHz (target 12) jika diatas 12
--> monitoring
3. DLUT 15 MHz (target 18) jika diatas 18
--> monitoring
5. DL PRB Utilization > 70% dan CUL >=
300 and BW = 15 MHz --> lihat CQI
a.
Avg CQI > 10, BW 15, PRB > 70%, TA aman --> Propose New site
b. Avg CQI > 10, BW 15, PRB > 70%, TA
"overshoot"--> Physical tuning (Propose Site audit)
c. Avg CQI < 10 --> Physical tuning
(Propose site audit)
6. Transport Bad --> Transport Check,
7. RRC connmax < 10 but Low Throughput
--> low sample (please check hourly)
8. DL CQI 64 QAM < 10% --> Physical
tuning (Propose Site audit)
9. HOSR-IF < 97 --> HOSRIF optimization
(block-list, NREL etc)
10. DL latency > 9 ms --> Transport check