Definition: Ability of a user to retain
the E-RAB once Connected for the desired duration.
Point:-E-RAB release can be initiated by ENB &
MME
Definition based on Counter:-
SARR=[(PmErabRelAbnormalEnbAct+PmErabRelMmeAct)/
(PmErabRelAbnormalEnbAct+PmErabRelNormalEnb+PmErabRelMme)]*100
Enb Initiated
E-Rab Release:-
1>
PmErabRelNormalEnb
2> PmErabRelAbnormalEnbAct
MME Initiated E-Rab Release:1> PmErabRelMme
2>PmErabRelMmeAct
RetainAbility/SARR(Session
abnormal release rate) :-
1> pmErabRelAbnormalEnbActCdt(The total number of abnormal ERAB
releases by the eNB per cell due cell down time (manual intervention) with the
pre-condition that the Initial Context Establishment procedure must first have
been successfully completed and that there was data in either the UL or DL
buffer (i.e. active).
Soln:
Check Outage report or Fluctuation Report.
2>pmErabRelAbnormalEnbActHo(The total number of abnormal ERAB
releases per cell by the eNB due to handover execution failure and that there
was data in either the UL or DL buffer (i.e. active).
Soln:1>PCI
Collision issue check(PCI Planning should be correct).There should no PCI
re-use within near by cell(1tier,2tier neib).
2>
Coverage issue(make Any PCI Dominant which should be based on Clutter as per
Common sense).Make EDT,Change Azimuth
3>
High UL Interference issue on Target cell(PmRadiorecInterferencePwr). Check
Connection b/w Antenna Connector & RRU Connector.
4> Also Repeater is responsile sometimes for Hi-UL
Interference.Might be due to Power Leakage
RetainAbility/SARR(Session abnormal release rate)
4> H/W
issue,Alarm issue.Correct the issue based on Problem u Identify.Take help of
Alex if you are not Understanding the Alarm meaning.
3> pmErabRelAbnormalEnbActUeLost(The
total number of abnormal ERAB
releases by the
eNB per cell due that the contact with the UE is lost with the precondition
that the Initial Context Establishment procedure must first have been
successfully completed and that there was data in either the UL or DL buffer
(i.e. active).
Soln: 1> Solve the Poor Coverage issue by making
Tilt,Azimuth change or Parameter change(Part of Sector Pwr,ENB Power), for
uplink Coverage(P0NominalPucch,P0NominalPusch).
2>
High Ul Interference issue(As per earlier mentioned.Also make sure Nominal pwr
Should not set very high otherwise it will create interference in neib cell).
RetainAbility/SARR(Session abnormal
release rate) :-
4>
pmErabRelAbnormalEnbLic(The total number of abnormal E-RAB Releases
initiated by the RBS due to license reject (per cell). Soln:1.
Recently this issue I have faced in “Sprint NV Project”.After analysis it was
found that there was issue with LKF file.Once New LKF file uploaded issue get
resolved.
2.
If LKF is correctly loaded then This counter will Peg only When user have
crossed the ENB License limit.
Pls
upgrade the License.Once u think that every basic Optimization u have done.
5>pmErabRelAbnormalEnbActTnFail(The
total number of abnormal
ERAB releases per
cell due to S1 interface down, "X2 interface down" or
completed and
that there was data in either the UL or DL buffer (i.e. active).
Soln:
1> Raise Ticket to NOC or IM Team to resolved the issue.
RetainAbility/SARR(Session abnormal release rate)
6>pmErabRelAbnormalEnbActHpr(The
total number of abnormal ERAB releases by the eNB per cell due to handover
preparation and that there was data in either the UL or DL buffer (i.e.
active).
Soln:1>MME
might be Locked/ disabled.
2> MME mismatch b/w Scource & Target cell.
3>
Tranport issue suspected.
4>
License issue suspected.
5>
Site Configuration issue.
6>
Hi-Load on Target Cell.
RetainAbility/SARR(Session
abnormal release rate)
› From drive test analysis, it
was observed that a large portion of the drop calls were due to poor radio
environment.
› Just before HO,
it was observed that the UE SINR was poor and this caused the UE to drag the
call in poor radio environment rather than HO faster to a neighbour cell with
better RSRP.
› In this
optimization project, 2 parameters were tuned; A3offset and
a2TresholdRsrpPrim.
– A3offset
: change from 3 to 2 db
– a2TresholdRsrpPrim
: change from -120 to -110 dbm
› A trial was also
conducted to evaluate the impact of changing the values below for a few sites
with high DCR:
– DataRadioBearer
: dlMaxRetxThreshold / ulMaxRetxThreshold ›
8 to 32
– SignalingRadioBearer
: dlMaxRetxThreshold / ulMaxRetxThreshold
› 8 to 32Retainibility/SARR(Session abnormal release rate) :
With
current A3 setting, A3 event handover will be performed when neighbour cell is
greater than a3Offset + hysteresis (RSRP) of the current serving cell.
a3Offset = 3 dB, hysteresis = 1dB Handover will only be performed once Neighbour Cell RSRP
> 4dB of Serving Cell RSRP
Thus,
it is important to expedite the HO with reduction of a3Offset to 2 dB. After
the parameter change, it was observed that the drop calls due to call dragging
was reduced in a cluster of 20 sites.
No comments:
Post a Comment